Any real benefit of the one you linked versus the one I've used before?
I've got maybe 75-100sqft of the stuff to use.
Getting sick and tired of looking at our garbage basement so will be starting up hopefully this weekend.
01. Clear out all the junk
02. TYVEK against the block
03. Rigid Insulation + furring on all walls
04. Lay down the DRI-CORE
05. Install drywall
06. Install flooring (still debating on vinyl planks or tiles, or even some laminate as I've got a few boxes left over from our reno and it would match the rest of the basement)
07. Install pony panel (have an old 100A laying around).
08. Remove old cabinets and sink
09. Install new cabinets and sink
10. Install drop ceiling (or something to cover up)