Rode 507 Thursday and on the top half saw dozens of work vehicles spread out over a 5 - 10 km stretch. They appeared to be setting up for some major roadwork that I'm sure is going to result in lane closures and flagmen everywhere stopping traffic.

There is a notice here re a few culverts, but this seems like minor works compared to the numbers of vehicles I saw. Road Closures/Road Construction
 

busabim

Well-known member
Site Supporter
I rode it today from bottom to Gooderham, what a fuggin disappointment. Havent ridden it in years.

Some new pavement, some pavement was pretty harsh; Not worth the drive from Toronto IMHO.

BB
 

ReSTored

Well-known member
I rode it yesterday, a few stretches of new pavement, uncrowded, passed 2 cars. Same with Glamorgan. Given the number of workers there setting up I was expecting major work, not a few patches here and there.

62 south of Elephant Road through Bancroft and then 28 south to 118 west a nightmare, Jam packed and slow. Should have turned around and redone Elephant Road on way back to 118. Avoid 62 and 28, especially on the weekend.
 

justride

Well-known member
Was there yesterday afternoon. Not sure why they stopped resurfacing the road halfway. smooth sailing then wham - my back!
BTW- didn't get a good look but I think there is pothole/sinkhole on the northbound lane, on the left tire lane. It's circled with spray paint about the size of a garbage can lid. So heads up!
 
Last edited:

ReSTored

Well-known member
There again today, about 3/4 of the way up there is a 5 km stretch being worked on. Pavement removed both lanes and new gravel being compacted in places, sometimes 3" - 4" deep. Road was in pretty rough shape and this hassle is the price of getting it fixed I guess.

............. I think there is pothole/sinkhole on the northbound lane, on the left tire lane. It's circled with spray paint about the size of a garbage can lid. So heads up!..............

It's been fixed.
 

justride

Well-known member
"about 3/4 of the way up there is a 5 km stretch being worked on"
Was on the 507 yesterday. road work is not done. nice and easy!
 

conundrum

Well-known member
I'm starting to think they won't be done until the snow falls...sadly
 

OSIRIS_001

Well-known member
Site Supporter
The Peterborough County office confirms :

Outstanding is the line painting which prior to completing the Contractor will sweep CR507 to remove any remaining debris, stone and dust.

Tentative schedule within two weeks.
 

Torren

Well-known member
Site Supporter
There's still a few km stretch up near Gooderam that is loose gravel as of yesterday.
 

voyageur

Well-known member
Site Supporter
I had updated this in the other thread, but posting it here as well.

I rode 507 a couple of weeks back. 5 km section in the middle was loose gravel and construction. Also, there was some sort of construction (piling or something) going on at another spot. But FWIW, I enjoyed the other sections of the road and it was my first time there so not a bad run.
 