skyway bridge hamilton

justride

Well-known member
sat. 16 10:30pm
skyway bridge toronto bound two left lane closed(bridge maintance on site). the two lane start closing before the bridge and all 4 lanes are clear just near the end of the bridge. lots of bike out. great night for a rip!
 
Back
Top Bottom