Construction at Mosport



Results 1 to 20 of 134

Thread: Construction at Mosport

  • Share
  • Thread Tools
  • Display

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #10
    Banned
    Join Date
    Aug 2009
    Posts
    5,134

    Re: Construction at Mosport

    Quote Originally Posted by Wingboy View Post
    What happened to the Fort Erie development? I can't imagine anything being built for Nascar at Mosport.And i can't see anyone pouring much money into Mosport really.There isn't enough interest.
    Fort Erie is before the OMB as a result of objections from some local residents. Don't expect any decisions until mid-next year, and don't expect spades in teh ground until after that decision.

    Tunnel under corner 9 at Mosport is a go, track closes in under two weeks so they can rip the track apart at corner nine to build an underpass high enough for transports and wide enough for two-way truck traffic under the track. New admin building being built on the outside of the front straight. Massively-expanded Gate 3 complex. The gravel sub-bed for a new road network and parking on outside of front straight right over to the oval is well underway. The paddock is being upgraded and the trailer shanty town in the paddock is on its way elsewhere in the near future. Parts of the grounds are being levelled to provide major spectator parking facilities. Lots of trees are being stripped to add more camping areas and offer improved sightlines. This is all in support of obtaining a huge major race event, possibly next year, and if not next year then in the year afterwards.
    Last edited by turbodish; 10-05-2011 at 09:11 PM.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •