Just a heads up for you, we started paving that road today and will continue with it next week. Hopefully the next time you pass through it will be better for riding.
|
Was traveling in the area, just to let you guys know if you plan on using these roads, it is under construction and full of gravel on the road
Kirkfield Road from the town of Kirkfield all the way to the lift-locks.
From 44.564258,-78.980556 TO 44.591036,-78.989568
Also one of the side roads too, Talbot River Road
From 44.590408,-78.989341 TO 44.588704,-78.970082
This was as of 2011-JUNE-20.
Ride safe out there.
Ride:
2010 Suzuki SV650SA White (Current)
2009 Ninja 250r Black (2009 - 2010)
License:
GM (2010-07-07)
Just a heads up for you, we started paving that road today and will continue with it next week. Hopefully the next time you pass through it will be better for riding.
was up there today in my work truck, they were paving up to the parking lot for the lift locks and should be done that by the end of the day but north of there is all gravel and it looks like will be quite a while before they have finished.
Does anyone know if the section from Kirkfield to Dalrymple is still under construction. Hope to ride that way on the Labour Day Weekend?
Bookmarks